DX-RM01 Car Wash Site Support Solution

Wash Bay Room

A supporting space solution for equipment installation, site image and vehicle traffic flow.

Used with automatic car wash equipment to organize equipment space, vehicle entry and exit, drainage structure and site visual image.

Wash Bay Room
Site supportEquipment installation environment
Traffic planningSmoother vehicle entry and exit
DrainageDesigned around site conditions
Image upgradeUnified site presentation

PRODUCT OVERVIEW

Product Overview

The wash bay room is a site support solution rather than a standalone washing machine. It helps operators plan the equipment area, vehicle path, drainage, utilities and visual presentation around the car wash project.

A well-planned wash bay can make the project easier to install, easier to manage and more consistent in daily operation, especially for sites that need a unified service image.

Site support Traffic flow planning Drainage and utilities

TECHNICAL PARAMETERS

Technical Parameters

ParameterSpecification
Support typeWash bay room
Compatible equipmenttunnel, rollover, unattended and self-service wash equipment
Planning scopeequipment space, vehicle flow, drainage and wastewater, water and power reservations, site image
Site factorsdimensions, ceiling height, entry and exit direction, waiting area and drainage slope
Power conditionconfirmed according to equipment type and actual configuration
Water conditionconfirmed according to water use and operating frequency
Drainage and wastewaterplanned with sedimentation, filtration, drainage channels and local requirements
Vehicle traffic flowentry, wash area, exit and waiting area should remain smooth
Construction requirementsubject to the site plan and construction drawings
Remarksspecific dimensions and construction requirements should be confirmed by the site plan

CORE FEATURES

Core Features

Equipment space planning

Supports clear placement of wash equipment and service areas.

Vehicle flow design

Helps organize entry, wash, exit and waiting zones.

Drainage planning

Considers floor slope, drainage channels and wastewater handling.

Utility reservation

Coordinates water, power and other installation needs.

Site image consistency

Improves the visual order of the wash area.

Project-specific design

Final dimensions are confirmed according to the site plan.

WASH PROCESS

Wash Process

01

Review site conditions

Confirm dimensions, height, entry direction and traffic flow.

02

Match equipment type

Plan around tunnel, rollover, unattended or self-service equipment.

03

Plan utilities

Reserve water, power and drainage conditions.

04

Design vehicle flow

Arrange entry, wash, exit and waiting areas.

05

Prepare construction drawings

Confirm construction details before site work.

06

Install and commission

Complete equipment installation and site acceptance.

CORE SYSTEMS

Core Systems

Space Planning

Equipment Space Planning

Defines the wash area, equipment location and operating space.
Space / Equipment / Maintenance

Traffic Flow

Vehicle Flow Planning

Organizes entry, washing, exit and waiting zones.
Entry / Exit / Waiting area

Drainage

Drainage and Wastewater Planning

Coordinates floor slope, channels, sedimentation and filtration.
Drainage / Sedimentation / Filtration

Visual Image

Site Image Support

Helps form a cleaner and more unified service environment.
Image / Order / Service

QUALITY & SAFETY

Quality & Safety

Stable Equipment Quality

The system is planned around long-term commercial operation, with configuration matched to the site and vehicle type.

Site Safety Support

Vehicle guidance, operation prompts and regular maintenance help reduce abnormal operation risks.

APPLICATION SCENES

Application Scenarios

Automatic wash bays

For tunnel, rollover or unattended equipment installation.

Fuel station wash areas

For standardized support spaces.

Parking-area wash projects

For dedicated vehicle cleaning zones.

Car wash shops

For improving site image and traffic order.

Fleet wash points

For centralized daily cleaning.

New project planning

For projects that need construction guidance before equipment entry.

INSTALLATION NOTES

Use and Installation Notes

  • Confirm site dimensions, ceiling height, entry and exit direction before planning.
  • Equipment model and actual configuration determine power and water requirements.
  • Drainage should consider sedimentation, filtration, channels and local requirements.
  • Vehicle paths should keep the entrance, wash area, exit and waiting zone clear.
  • Construction should follow the confirmed site plan and drawings.
  • Final dimensions and construction requirements depend on the actual site solution.

Need a wash bay room planning proposal?

Dexiang can provide equipment selection, site planning, installation and after-sales service advice based on site conditions, vehicle flow and operating model.

Contact Us

4000-758-768