News Detail

Product updates, industry insights and project service information from Dexiang Car Wash

← Back to News
Project Planning

Getting ready for an automatic car wash project

Published: Category: Project PlanningReading time: about 3 minutes

Before launch, confirm site dimensions, drainage, power, traffic flow, operating model and maintenance space to reduce later adjustments.

Confirm site, water and power first

Early preparation determines whether an automatic car wash project can land smoothly. Many delays come from ignored site size, drainage, power or vehicle flow conditions.

Different equipment types require different length, width, height and turning radius. Stable water supply, drainage, power and control lines should be confirmed before equipment entry.

Plan the operating model in advance

Vehicle entry and exit flow should be planned early, especially for fuel stations, parking lots and park projects where wash traffic may affect existing business.

The operating model also matters. Staff-assisted, unattended, membership and bundled-service models require different payment, signage, site management and after-sales configurations.